Abraham Lincoln School #14

Project Overview

LAN was contracted by the Elizabeth Board of Education to design a new air conditioning system at the Abraham Lincoln School #14. The project required the conversion of their existing hot water only heating system to a two-pipe hot water heating and chilled water cooling system. The new system provided heating, cooling, and ventilation throughout the entire building.  

The existing ten-year-old boiler plant was reused along with a new 150-ton air cooled chiller to create primary hot water heating, primary chilled water cooling, and secondary dual-temperature loops. The existing hot water supply distribution system was reused and converted to a dual-temperature system. Several smaller spaces were provided with heating and cooling fan coil units and added to the new system. 

In addition to the new dual-temperature system to feed the classrooms, new direct expansion (DX) cooling systems were provided to the gymnasium, auditorium, and the main office. 

Client

Elizabeth Board of Education

Location

Elizabeth, New Jersey

Project Size

95,000 sf

Completion Date

October 2013

Markets

K-12 Education

Services

Mechanical, Electrical, Plumbing, Construction Admin